Side Tie Preformed With Pad

The preformed top tie is mainly used for binding between insulators and overhead insulated wires and bare wires in overhead lines of 10 kV and below.


  Contact Now
Product Details

The power distribution top tie can be used to fix bare or insulated wires in the top grooves of pin insulators and post insulators of the power distribution system. The binding wire can fix the wire in the top groove and the side groove.

 

According to different binding positions and methods, it can be divided into:

1. top tie preformed

2. Single side tie preformed

3. Double side tie preformed

4. Double top tie line

 

Item name

Model

Cable range

Length(mm)

 top tie preformed

TTF-1202

φ18.57~23.37

580

TTF-1203

φ23.39~27.90

660

TTF-1204

φ27.97~33.02

770

TTF-11373

φ34.2~37.02

770

Single side tie preformed

SSF-2202

φ18.57~23.37

750

SSF-2203

φ23.39~27.94

660

SSF-2204

φ27.97~33.02

760

SSF-2206

φ33.05~38.10

830

Double side tie preformed

DBST-2175

φ21.74~24.59

480

DBST-2460

φ24.61~27.84

495

DBST-2785

φ27.86~31.50

505

DBST-3150

φ31.52~35.61

520

Double top tie line

DSTCF-2175

φ21.74~24.59

490

DSTCF-2460

φ24.61~27.84

490

DSTCF-2785

φ27.86~31.50

540

DSTCF-3140

φ31.52~35.61

540

 

detail.jpg 

Technical characteristics   

◆High strength; tensile strength is 8-18 times that of aluminum binding wire and 3 times that of copper binding wire;   

◆High grip strength; low can easily exceed 350kg, so the disconnection can be limited within one span; and the load can be reduced before the pole and the structure are damaged;   

◆High pull-off strength; sufficient material strength and ring structure provide the necessary resistance to side pull and uplift, thereby effectively preventing the wire from leaving the insulator groove;   

◆It has good resilience; under additional loads such as tree impact, wire dancing and ice removal, due to its good resilience, the wire can maintain normal sag and tension;   

◆Radio interference level is low; does not exceed the interference level of insulators;   

◆Easy installation and improved construction efficiency; the power distribution tying line can be installed with bare hands in 30 seconds, and the installation time with a live insulating pole will not exceed 3 minutes; while the traditional manual tying needs at least 10 minutes.


Product form